Project Details
Future Energy Networks delivered a new high-voltage point of connection and substation installation for two commercial units at the former Royton Old Gas Works site.
Our works included the supply and installation of a new 500kVA GRP package substation on a prefabricated concrete base. We also installed the associated switchgear and completed all required testing and commissioning.
The project required close coordination between the civils, high-voltage installation and commissioning teams to ensure the new infrastructure was installed safely and capable of meeting the development’s electricity requirements. The complete high-voltage infrastructure was successfully delivered within six months from placement of order.
- Project Name Royton Old Gas Works
- Sector Commercial
- Services High-Voltage Electricity and Substation Installation
- Project Location Royton - Oldham
- Programme 6 Months