Future Energy Networks delivered an upgraded water connection for the Palace Theatre in Manchester.

Project Details

Future Energy Networks delivered an upgraded water connection for the Palace Theatre in Manchester.

The project was required to increase the available water capacity and support the theatre’s ongoing operational requirements.


Our works included a live connection onto the existing United Utilities water main and the installation of the upgraded supply into the site. Careful planning and coordination were required to complete the works safely while minimising disruption to the surrounding area.

The upgraded water connection was successfully delivered within eight weeks from placement of order.

  • Project Name Palace Theatre
  • Sector Leisure and Entertainment
  • Services Water
  • Project Location Cental Manchester
  • Programme 8 Weeks